April - May, 2011
AO Ansaldo-VEI made the contracts to supply 5 SVC for -UGMK-Steel (Tyumen, Russia) 35 kV 70 Mvar, for Energomashspecstal (Kramatorsk, Ukraine) 38,5 kV 70 Mvar and for Belorussian Steel Works (Zhlobin, Belorussia) – two SVC 10 kV 10 Mvar & one 33 kV 185 Mvar.

22 June, 2011
There was the meeting between the technical management of FGC UES and Ansaldo Sistemi Industriali regarding the common activity in Smart Grid development.

24 May, 2011
Negotiations between the management of FGC UES including the Chairman of the Management Board Oleg Budargin and Ansaldo Sistemi Industriali (ASI) took place. The questions to be discussed are the following: the cooperation between FGC UES and ASI in FACTS sphere and application of SVC produced by ASI Russian subsidiary AO Ansaldo-VEI.

April - May, 2011
AO Ansaldo-VEI made the contracts to supply 2 SVC 35 kV for Abinskiy electrometallurgical plant (Abinsk, Russia) 180 Mvar and Severstal-Sortovoy zavod Balakovo (Russia) 135 Mvar.

December, 2010
AO Ansaldo-VEI finished the revamping of two SVC 10 kV 20 Mvar at Belorussian Steel Works (Zhlobin, Belorussia).

27 June, 2010
Our SVC had been certified for application in FGC UES networks 110-500 kV.

December, 2009
The project named “CSRT”, which includes 2 static var compensators made under the scheme of controlled shunt reactor of transformer type (CSRT) with the capacity of 60 Mvar each to be connected to the bus bars 220 kV of the two substation of the power grid “Norte de Angola” was successfully commissioning.
The project CSRT provided:
• Reduction of active losses in the three transmission lines at 25%;
• Increase the limit of static and dynamic stability of 92 MW;
• Increase the transfer capacity of the three transmission lines of 50-60 MW due to improved stability, increase the voltage and unloading the lines from the reactive power.


September 2009
Static Var Compensator (SVC) with thyristor controlled reactor (TCR) power 65 Mvar and filter capacitor banks (FCB) power 58 Mvar for electrical arc furnance 120 ton and leadle furnance 22 MVA, was commissioned at JSC OMZ-Special Steels (Ijora plants, S.Petersburg)

June 2009
Frequency converter with force liquid cooling 6 kV 20 MW for soft start of 14 synchronous compressor motors was commissioned at “NIC CIAM” (Moscow region)

June 2009
First of two 10 kV, 45 Mvar Static Var Compensator (SVC) for for electric arc furnace was commissioned at JSC Staks (Krasnyi Sulin)

October 2009
Static Var Compensator (SVC) with thyristor controlled reactor (TCR) power 70 Mvar and filter capacitor banks (FCB) power 70 Mvar for electrical arc furnance 58 ton and leadle furnance 13 MVA was reconstructed and commissioned at JSC “Novorosmetall” (Novorossiysk)

June, 2008
Static var compensator 35 kV 160 Mvar was commissioned at the steel works JSC “Amurmetall” (Russia). There were displaced the thyristor valve, cooling and control systems

16-18 April, 2008
35 kV 45 Mvar static var compensator for electric arc furnace DSP-40 was commissioned at LLC “Electrostal” (Kurakhovo, Ukrain).

03 December 2007
03 December 2007
EMPRESA NACIONAL DE ELECTRICIDADE, Empresa Pública (Angola) signed the Contracts with ÀÎ Ansaldo-VEI, JSC “Zaporozhtransformator” (Ukraine) and ODEBRECHT-ANGOLA to supply 2 SVC 60 MVA 230 kV based on controlled shunt reactor-transformer technology for substations 230/66 kV Kazenga and Viana. The volume of AO Ansaldo-VEI supply includes the thyristor valves, FCB’s and control systems.


June, 2007
35 kV 45 Mvar static var compensator for electric arc furnace DSP-40 was commissioned at JSC “Novorosmetall” (Novorossiysk, Russia)



February, 2007
Thyristor converter 10 kV 3200 MW for soft start of 6 synchronous motors of cement mill drives was commissioned at the cement plant of JSC “Kizilkumcement” (town of Navoi, Uzbekistan)

December, 2006
Thyristor converter 6 kV 3150 MW for soft start of 6 synchronous motors of cement mill drives was commissioned at JSC “ Maltsovskiy portlandcement” (Brynskaya region, Russia)

December, 2006
35 kV 110 Mvar static var compensator for electric arc furnace DSP-80 was commissioned at the metallurgical plant of A. K. Serov (town of Serov, Russia)

November, 2006
Thyristor softstarter 6 kV 3150 kW for soft start of 4 synchronous motors of cement mill drives was commissioned at JSC “Schurovsky cement” (Russia)

September, 2006
Contract for revamping of SVC 35 kV 160Mvar for JSC “Amurmetall” (Komsomolsk-na-Amure, Russia) was signed

September, 2006
Thyristor softstarter 15.75 kV 27 MVA and the thyristor excitation system for 232 MW synchronous motor-generator was commissioned at Tashlyk pumped storage power plant (Ukraine)

August, 2006
Contract for 35 kV 45 Mvar SVC for JSC “Electrostal” (Donetsk, Ukraine) was signed

May, 2006
Contract for 35 kV 45 Mvar SVC for JSC “Novorosmetall” (Novorossiysk) was signed


âûñîêîâîëüíîå îáîðóäîâàíèå, ýëåêòðîèçîëÿöèîííûå ìàòåðèàëû, îçîííûå òåõíîëîãèè

Our Partners


Abinskiy electrometallurgical plant
ABS Infinity (Kazakhstan)
AlphaCement (Holcim Group)
Amurmetall   
ASU Trading Group (Uzbekistan)
Belarus metal works
Electrostal (Ukraine)
Empresa Nacional de Electricidade Empresa Publica (Angola)
Energomashspecstal (Ukraine)
EuroCement
FGS UES
Ijora plants
KEGOC (Kazakhstan)
KizilkumCement (Uzbekistan)
Lukoil-AIK
Maxi Invest
Mechel Steel
Moldova Steel Works
NIIEFA-Energo
Novo-Lipetskiy metallurgical combinat
Odebrecht (Brazil)
Russian Electrotechnical Concern
Severstal Russian Steel
Sibelectrotherm
Soyuz Corporation
Tube Metallurgical Company (TMK)
United Metallurgical Company (OMK)
UralKaliy
UMMC-Steel

© ANSALDOVEI.RU 2002-2012
12, Krasnokazarmennaya st., Moscow, Russia, 111250
phone: +7(495) 640-9003, 640-9004, 640-9005, 640-9010
E-mail: info@ansaldovei.ru
Rambler's Top100 Made by EnterWEB

Ýëåêòðîòåõíè÷åñêàÿ áàííåðíàÿ ñåòü